摘要
本文阐述一例笔者亲身经历的桩基工程 ,因其选型错误而导致施工中发生一系列的问题与处理措施。从理论与实践上证明了淤泥地层中采用人工挖孔桩引发流泥的可能性及注意事项 ,同时总结了该工程的经验教训 。
This paper analyzes a pile foundation engineering experienced by author.The pile style selected is so unsuitable that some porblem must be dealt with in the construction.The theory and engineering practice shows the possibility of flowing soil caused by the man-dug pile in the muck foundation.The lesson from the engineering is put forward as a reference for other engineering.
出处
《福建建筑》
2001年第1期55-56,共2页
Fujian Architecture & Construction