大型高速铁路客运站站场设备能力适应性评估 被引量:3

Adaptability Evaluation of Equipment Capacity in Large-scale High-speed Railway Passenger Station Yard
在线阅读 下载PDF
导出
摘要 通过分析运转设备能力适应性指标,构建大型高速铁路客运站站场设备能力适应性评估体系。以成都东站为实例,对兼办普速客车的大型高速铁路客运站咽喉区、到发线、折返线和动车组出入段走行线等主要运转设备的能力适应性进行分析,并提出相应的调整改进方案。 Through analyzing the adaptability index of operation equipment capacity, the evaluation system of the equipment capacity adaptability in large-scale high-speed railway passenger station yard was established. Taking Chengdu East Station as example, the capacity adaptability of main operation equipments in large-scale high-speed railway passenger stations which also handling common-speed passenger trains was analyzed, including throat area, arrival-departure track, back track and running line for EMUs transferring in depot, and corresponding adjustment and improvement programs were put forward in this paper.
出处 《铁道运输与经济》 北大核心 2014年第1期55-59,共5页 Railway Transport and Economy
关键词 高速铁路 客运站 设备能力 指标 High-speed Railway Passenger Station Equipment Capacity Index
  • 相关文献

参考文献4

  • 1张晋;马驷.大型客运站站场设计方案仿真评估指标体系研究[J]高速铁路技术,2011(2):339-343.
  • 2张 晋.客运专线客运站场设计方案评估指标体系研究[D]{H}成都:西南交通大学,2012.
  • 3刘其斌;马桂贞.铁路车站及枢纽[M]北京:中国铁道出版社,2002.
  • 4彭其渊;王慈光.铁路行车组织[M]{H}北京:中国铁道出版社,2010.

同被引文献22

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部