拱塔斜拉桥桥塔钢-混结合段空间受力分析 被引量:12

Analysis of spatial mechanical behavior of steel-concrete combined sections of an arch-tower cable-stayed bridge tower
在线阅读 下载PDF
导出
摘要 斜拉桥桥塔钢-混结合段结构复杂,构件众多,使得其受力状态极为复杂.以某拱塔斜拉桥的桥塔钢-混结合段为基础,利用Midas/Civil建立空间杆系模型,进行整体静力分析,确定桥塔钢-混结合段部位3种最不利荷载工况,得出其荷载和位移的边界条件.再利用大型空间有限元软件ANSYS,建立桥塔钢-混结合段三维实体模型,并进行受力分析,明确钢-混结合段处钢板和混凝土的受力性能.计算结果表明:钢-混结合段的变形较小,钢板和混凝土的应力水平较小,结构的安全储备良好. The combined sections of cable-stayed bridge tower contain many members,so that the stress had been extremely complex.Based on the tower of an arch-tower cable-stayed bridge,Midas/Civil is used to establish a space truss model for the overall analysis to determine the most unfavorable parts of the steel-concrete combined sections under loading and displacement conditions.With the larger general-purpose finite element software ANSYS,three-dimensinal solid model is established,which can determine the performance of steel and concrete of the combined sections.The calculated results show that the deformation and stress level of steel-concrete composite section is small,which can show the structure is safe.
出处 《交通科学与工程》 2013年第2期35-40,55,共7页 Journal of Transport Science and Engineering
关键词 拱形桥塔 钢-混结合段 有限元法 局部分析 arch-tower steel-concrete combined sections finite element method local analysis
  • 相关文献

参考文献4

二级参考文献16

  • 1余报楚,张哲,张洪金.金马大桥主塔直束预应力筋设计技术与研究分析[J].公路交通科技,2005,22(5):104-107. 被引量:8
  • 2王晓明,郝宪武,段瑞芳.斜拉桥塔梁固接处的空间应力分析[J].湖南交通科技,2007,33(1):84-88. 被引量:6
  • 3Leonhardt F,.Amdme W,Andrae H P,Hmnre W.Neues erbundmittel fuer stahlverbund-tragwerke rnit hoher dauerfestigkeit(New,improved joint means for composite loadbearing structures with high fatigue strength)[J].Beton-und Stahlbetonbau,1987,82(12).
  • 4Velendanda M R,Hosain M U.Behaviour of perfobond rib shear connector:push-out tests[-J].Canadian Journal of Civil Engineering,1992,19(1).
  • 5Leonhardt F.Development and testing of a new shear connector for steel-concrete composite bridges[C].4th International bridge engineering conference,1995.
  • 6Oguejiofor E C,Hosain M U.Parametric study of perfobond rib shear connectors[J].Canadian Journal of Civil Engineering,1994,21(4).
  • 7Oguejiofor E C,Hosain M U.Perfobond rib connectors for composite beams[J].Composite Construction in Steel and Concrete,1992.
  • 8Velendanda M R,Hosain M U.Behaviour of perfobond rib shear connector:push-out tests[C].Proceedings of the Annual Conference and Biennial Environmental Specialty Conference,1990,712.
  • 9Oguejiofor E C,Hosain M U.Behaviour of perfobond rib shear connectors in composite beams:Full size tests[C].Proceedings of the Annual Conference and Biennial Environmentsl Speciality Conference,1990,751.
  • 10交通部公路规划设计院.JTJ023-85公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:人民交通出版社,1985

共引文献50

同被引文献84

引证文献12

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部