消力池渐变段体型对消能效果的影响 被引量:7

Influence of Transition Section Type of Stilling Basin on Energy Dissipation
在线阅读 下载PDF
导出
摘要 针对黄金坪泄洪洞消力池受地形地质条件的限制,消力池长度明显不足、水跃跃首流态较差、消能效果不理想的问题,通过水力学模型试验,调整优化了泄洪洞出口跌坎高度、挑角及坡度体型,并观测了消力池水流流态、水面线、临底流速、底板压强、出口流态和流速等水力特性指标。结果表明,与原设计方案相比,调整体型后的消力池流态得到了很好地控制、消能效果增强,消力池出池水面跌落和流速均有所减小,各项水力学参数指标满足设计要求,通过体型优化实现了在原有消力池长度条件下改善流态和增强消能的目的。 Restricted by geography and geological condition,the length of stilling basin of Huangjinping tunnel spillway is obviously inadequate.Flow regime of the head of hydraulic jump and energy dissipation effect are rather bad.Optimized the height,the bucket angle and the slope of the drop sill of the flood discharge tunnel outlet are optimized by the hydraulic model experiments.And then it observes the hydraulic characteristics of flow pattern,water surface line,velocity near the bottom,pressure at the bottom,flow pattern and velocity at outlet.Compared with the original design,the results show that the flow pattern has been controlled very well and the effect of energy dissipation is increased;water drop and velocity of stilling basin at the outlet are reduced;the hydraulic parameters meet the design requirements.Therefore,it reaches the goal of improving the flow pattern and hydraulic characteristics with optimization project form at the condition of keeping the original length of the stilling basin.
出处 《水电能源科学》 北大核心 2012年第11期85-87,共3页 Water Resources and Power
关键词 消力池 渐变段 体型 水力特性 消能效果 stilling basin transition section project form hydraulic characteristics effect of energy dissipation
  • 相关文献

参考文献4

二级参考文献14

  • 1杨首龙.宽尾墩-阶梯式坝面-戽池联合消能工的水力特性[J].水力发电,1994,21(9):29-31. 被引量:12
  • 2郑文才.萨彦舒申斯克水电站消力池运行经验[J].水利水电快报,1995,16(20):10-15. 被引量:9
  • 3高鹏,杨永全,邓军,张建民.多孔淹没出流消力池复杂流态分析[J].四川大学学报(工程科学版),2006,38(5):70-75. 被引量:10
  • 4田儒琴.湖南省花垣县水电站枢纽建筑物布置设计说明书[R].湘西自治州水利水电勘测设计研究院,2007.
  • 5王均星,朱祖国,陈利强.湖南竹篙滩水电站水工模型试验研究报告[R].武汉大学水资源与水电工程科学国家重点实验室,2009.
  • 6吴雪茹.溢流坝后河床冲刷探讨.中国农村水利水电,2007,.
  • 7李炜 徐孝平.水力学[M].武汉:武汉大学出版社,2001..
  • 8Diez-Cascon J etc. Studies on the hydraulic behavior of stepped spillways [ J ] . Water Power and Dam Construction, 1991, (9) :22-26.
  • 9Bindo M, Gautier J and Lacroix F: The stepped spillway of M'Bali dam, Water Power and Dam [J]. Construction,1993,(1) :35~36
  • 10Unami, K. , Kawachi, T. , Babar, M. Munir, Itagaki, H.: Two-dimensional numerical model of spillway flow[J].Journal of Hydraulic Engineering, v 125, n 4, 1999, (4):369-375.

共引文献124

同被引文献53

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部