为提高上海轨道交通9号线基于通信的列车控制后备模式下线路的运输能力,从缩短相关区段的列车运行间隔着手,对增设信号机、改进运输组织方式等可行性方案进行了分析比较。提出组合运行方式和大小交路方式作为应急方案、分割计轴区段作为解决方案的建议。
In order to improve the transport capacity of Shanghai rail transit Line 9 under the Fallback Mode of CBTC, this paper focuses on how to shorten the arriving intervals of some trains in certain divisions, deeply analyzes and compares the feasibility about adding signal equipments and taking a better transport organization mode, adopting combined operation, long & short routing as the substitute plan, and dividing the axle counter blocks as the solution.
出处
《城市轨道交通研究》
北大核心
2012年第9期97-100,共4页
Urban Mass Transit
关键词
上海轨道交通9号线
运输能力
运营组织
Shanghai rail transit Line 9
transport capaci- ty
operating organization