摘要
In coalmines of China, horizontal directional drilling (HDD) is an increasingly popular method for underground in-seam gas drainage. Numerical simulation, especially finite element analysis, is often used as an effective method to improve HDD operation. These improvements focus on rock-breaking efficiency, directional precision, stability of the borehole wall, and reliability of the drill equipment. On the basis of underground drilling characteristics, typical numerical simulation exam- ples in drilling techniques and equipment are summarized and analyzed. In the end, the future development trends of numerical simulation in underground in-seam drilling are proposed.
基金
Supported by the National Natural Science Foundation of China (50805010)
the Natural Science Foundation of Shaanxi Province (2011JM70 17)