摘要
基于对新疆华电红雁池发电厂#1、#2锅炉干除渣系统改造,在系统构成、可靠性、经济性等方面进行了分析,改造后的干除渣系统不仅系统简化、稳定性提高,还节约了厂用电量。
Based on the transformation of #1 and #2 boilers for Sinkiang Huadian Hongyanchi power plant deslagging system, the system structure, reliability', economy and other aspects were analysed, after transformation, not dry seslagging system to simplify and stability, but also saved auxiliary power.
出处
《制冷空调与电力机械》
2011年第6期73-75,53,共4页
Refrigeration Air Conditioning & Electric Power Machinery
关键词
锅炉
干除渣
改造
boiler
dry deslagging
transformation dry only