酒钢CSP 120 t精炼钢包过程控制研究 被引量:1

Research on Process Control of 120 t Refining Ladle of CSP
在线阅读 下载PDF
导出
摘要 本文通过对酒钢CSP钢包过程控制研究表明:静置钢包内壁温降1℃/min,外壁温降0.4℃/min;钢包内外壁的温差为:包底>包壁>渣线;随钢包的综合包龄、一次性包龄的增加,钢水的温降越大;缩短钢包的循环周期,减少周转钢包的数量,利于钢包的循环、管理。 The process control of CSP ladle of Jiuquan IronSteel Group Ltd.was investigated in this paper.It showed that temperature drop of static ladle's inside wall was 1℃/min and temperature drop of static ladle's outside wall was 0.4℃/min.The temperature difference between inside wall and outside wall get bigger from ladle bottom,to wall and to slag lining.The temperature drop of molten steel increases with the increase in the service lives of ladle and ladle's slag lining bricks.It was beneficial to ladle's circulation and administration by reducing the ladle's cycle time and cycle quantity.
作者 邹明 汤建华
出处 《甘肃冶金》 2011年第5期1-3,6,共4页 Gansu Metallurgy
关键词 钢包 温度 过程控制 ladle temperature process control
  • 相关文献

参考文献2

共引文献24

同被引文献13

  • 1刘青,赵平,吴晓东,田乃媛.钢包的运行控制[J].北京科技大学学报,2005,27(2):235-239. 被引量:26
  • 2TANG Lixin, WANG Gongshu. Decision support system for the batching problems of steelmaking and continuous-casting production[J]. Omega, 2008, 36(6): 976-980.
  • 3Mohanty P P. An agent-oriented approach to resolve the production planning complexities for a modem steel manufacturing system[J]. Int J Adv Manuf Technoi, 2004, 24(3/4): 199-205.
  • 4Bellabdaoui A, Teghem J. A mixed-integer linear programming model for the continuous casting planning[J]. International Journal of Production Economics, 2006, 104(2): 260-270.
  • 5Atighehchian A, Bijari M, Tarkesh H. A novel hybrid algorithm for scheduling steel: Making continuous casting production[J]. Computers and Operations Research, 2009, 36(8): 2450-2461.
  • 6TIAN Shilong, YANG Zhili. Numerical simulation on temperature drop of molten steel in 210 t ladle[C]//Kao J C M. Frontiers of Materials, Chemical and Metallurgical Technologies. Stafa-Zurich, Switzerland: Trans Tech Publications Ltd, 2012: 883-887.
  • 7黄帮福.首秦原料-连铸区段物质流调控专家系统[D].北京:北京科技大学冶金与生态工程学院,2011:84-86.
  • 8王金明,张坤,吕圣会.运用甘特图确定不锈钢连浇炉数[J].山东冶金,2009,31(5):83-85. 被引量:11
  • 9ZHU Dao-fei,ZHENG Zhong,GAO Xiao-qiang.Intelligent Optimization-Based Production Planning and Simulation Analysis for Steelmaking and Continuous Casting Process[J].Journal of Iron and Steel Research International,2010,17(9):19-24. 被引量:14
  • 10贺东风,于港,徐安军,吴鹏飞,田乃媛.基于精准设计的甘特图组合产能核算[J].北京科技大学学报,2010,32(12):1618-1622. 被引量:9

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部