悬吊锚筋桩应用于隧洞进出口围岩加固的研究 被引量:1

APPLICATION OF SUSPENSORY ANCHOR-STAKE TO REINFORCEMENT OF SURROUNDING ROCK MASS AT TUNNEL INLET AND OUTLET
在线阅读 下载PDF
导出
摘要 首先对悬吊锚筋桩数值模拟方法及力学参数取值问题进行分析,然后通过对一简单悬吊锚筋桩算例进行参数敏感性分析,分析结果表明:是否考虑灌浆环的摩擦作用对计算结果的影响很大,因此在悬吊锚筋桩的数值模拟过程中合理地模拟灌浆环非常重要。最后,对糯扎渡水电站1#导流隧洞进口0+015 m剖面不同条件下隧洞的开挖支护进行数值模拟,重点分析围岩和加固措施之间的相互作用及悬吊锚筋桩对顶拱围岩变形的影响。计算结果表明:悬吊锚筋桩能够有效地控制隧洞进口段顶拱的沉降变形。 Because of the stability problem of rock mass is very poor in the inlet and outlet section of tunnel,so some strong reinforcement measures should be applied;and the suspensory anchor-stake is one of these effective reinforcement methods.Firstly,the numerical simulation method and the mechanical parameters for suspensory anchor-stake are analyzed;then a simple case study for parameters sensitivity analysis of suspensory anchor-stake is carried out.The computing results show that,the results are influenced by the friction effect of grout is considered or not;so that,the rational simulation of grout is very important to the numerical simulation of suspensory anchor-stake.Finally,the numerical simulation of excavation and reinforcement of section 0+015 m of diversion tunnel #1 at the Nuozhadu hydropower station under different conditions is carried out;the interaction of rock mass and suspensory anchor-stake,the deformation of tunnel crown rock mass influenced by the suspensory anchor-stake are analyzed.The computing results show that,the subsidence deformation of tunnel crown rock mass is controlled by the suspensory anchor-stake effectively.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2011年第10期2040-2048,共9页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金青年基金项目(51009104) 四川大学青年教师基金资助课题(20082154)
关键词 隧道工程 加固方法 悬吊锚筋桩 数值模拟 应力变形 tunnelling engineering reinforcement method suspensory anchor-stake numerical simulation stress and deformation
  • 相关文献

参考文献15

  • 1HOEK E, BROWN E T. Underground excavations in rock[M] London: Institution of Mining and Metallurgy, 1980:1 - 213.
  • 2OZSAN A, BASARIR H. Support capacity estimation of a diversion tunnel in weak rock[J]. Engineering Geology, 2003, 68(3/4):319- 331.
  • 3BARTON N. Some new Q-value correlations to assist in site characterization and tunnel design[J]. International Journal of Rock Mechanics and Mining Sciences, 2002, 39(2).. 185 - 216.
  • 4ORESTE P P. A numerical approach to the hyperstatic reaction method for the dimensioning of tunnel supports[J]. Ttmnelling and Underground Space Technology, 2007, 22(2): 185-205.
  • 5ORESTE P P. Analysis of structural interaction in tunnels using the convergence-confinement approach[J]. Tunnelling and Underground Space Technology, 2003, 18(4): 347-363.
  • 6HISATAKE M, OHNO S. Effects of pipe roof supports and the excavation method on the displacements above a tunnel face[J]. Tunnelling and Underground Space Technology, 2008, 23(2).. 120 - 127.
  • 7SATO M, KANIE S, MIKAMI T. Mathematical analogy of a beam on elastic supports as a beam on elastic foundation[J]. Applied Mathematical Modelling, 2008, 32(5): 688-699.
  • 8张顶立.海底隧道不良地质体及结构界面的变形控制技术[J].岩石力学与工程学报,2007,26(11):2161-2169. 被引量:61
  • 9朱维申,孙爱花,王文涛,李术才.大型洞室群高边墙位移预测和围岩稳定性判别方法[J].岩石力学与工程学报,2007,26(9):1729-1736. 被引量:45
  • 10邬爱清,丁秀丽,陈胜宏,石根华.DDA方法在复杂地质条件下地下厂房围岩变形与破坏特征分析中的应用研究[J].岩石力学与工程学报,2006,25(1):1-8. 被引量:48

二级参考文献61

共引文献183

同被引文献12

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部