摘要 将抽水蓄能机组纳入机组组合问题当中,据此建立了含风电与抽水蓄能电站的系统优化运行模型。以山东电网实际系统为例,根据机组组合的结果分析了不同季节典型日下抽水蓄能电站对于风电接入电网各项指标的影响。结果表明,当风电容量较小时,抽水蓄能电站的作用不明显;只有当风电容量超出系统的接纳能力出现弃风以后,抽水蓄能电站的作用才得以体现出来,风电并网的各项指标随抽水蓄能电站容量的增加有明显的改善。 The pumped storage power station was considered in unit commitment problem.Based on this,an optimal operation model of the power system was built.The impacts of the pumped storage power station(PSPS) with different capacities to targets of grid-connected wind power in a typical day in different seasons were analyzed according to unit commitment results based on the Shandong Power Grid.The results showed that the impact was not obvious when capacity of wind power was small.The targets were improved with increasing the pumped power storage station until the capacity of wind power was so large that some wind power was abandoned.
出处 《山东大学学报(工学版)》 CAS 北大核心 2011年第5期138-142,共5页 Journal of Shandong University(Engineering Science)
基金 山东省自然科学基金资助项目(11390005201006)
关键词 抽水蓄能电站 风电 机组组合 pumped storage power station wind power unit commitment
  • 相关文献

参考文献16

  • 12009年中国风电装机容量统计[J].风能,2010(1):28-33. 被引量:11
  • 2中国风电产业网.中国风能发电现状与展望[EB/OL].(2011-03-15) [2011-03-16 ]. http://www, windchn. com/webinfo/wfview000159860.html.
  • 3BUENO C, CARTA J A. Wind powered pumped hydro storage systems, a means of increasing the penetration of renewable energy in the Canary Islands [ J ]. Renewable and Sustainable Energy Reviews, 2006, 10:312-340.
  • 4NGOC P D, PHAM T H, BACHA S, et al. Optimal op- eration for a wind-hydro power plant to participate to an- ciliary services [ C ]// IEEE International Conference on Industrial Technology, Churchill, Australia: IEEE, 2009 : 1222-1226.
  • 5谭志忠,刘德有,欧传奇,王丰.风电-抽水蓄能联合系统的优化运行模型[J].河海大学学报(自然科学版),2008,36(1):58-62. 被引量:31
  • 6BUENO C, CARTA JA. Technical-economic analysis of wind-powered pumped hydro storage systems, part I: model development [ J ]. Solar Energy, 2005, 78 ( 3 ) : 382-395.
  • 7潘文霞,范永威,朱莉,高阿龙.风电场中抽水蓄能系统容量的优化选择[J].电工技术学报,2008,23(3):120-124. 被引量:35
  • 8Tuohy Aidan, Malley Mark. Impact of Pumped Storage on Power Systems with Increasing Wind Penetration [ C]//IEEE Power & Energy Society General Meeting, New York: IEEE, 2009: 2642-2649.
  • 9张珍玲,蔡镇坤.抽水蓄能电站在电网运行中的作用及经济价值[J].华电技术,2008,30(11):1-3. 被引量:16
  • 10辛刚,韩德顺,张健.山东电网负荷特性分析[J].山东电力技术,2009,36(1):7-10. 被引量:6