期刊文献+

三维全空间坑道直流聚焦超前探测数值模拟 被引量:3

3D NUMERICAL MODELING OF ADVANCED EXPLORATION IN TUNNEL BASED ON THE DC FOCUS RESISTIVITY METHOD
在线阅读 下载PDF
导出
摘要 应用同性点源之间的相斥和聚焦原理,设计出适合坑道空间的垂直聚焦超前探测方案。利用有限元法结合高效行压缩存储格式及迭代求解算法,对三维坑道空间中聚焦超前探测效果进行模拟研究。数值计算结果与土槽物理模拟实验结果对比,说明设计方案达到l了聚焦超前探测的目地。通过坑道复杂模型计算,表明垂直聚焦观测方案能够有效探测前方和旁侧存在的不良地质体。 The tunnel DC resistivity advanced detection method is a method based on the theory of equipotential spherical surface that is excited by point source in full space.Due to the existence of a considerable impact from tunnel and detection environment when the measurement is performed at the rear of the heading face,difficulty in data interpretation is largely increased.On the basis of vertical ground resistivity sounding and side DC logging technology,the authors proposed a vertical focused advanced detection project which is suitable for tunnel space.The finite element numerical simulation method(FEM) was used to simulate the effect of focused advanced detection method in three-dimensional tunnel space.Compressed storage technology and preconditioned iterative algorithm could greatly improve the efficiency of forward modeling as well.A comparison between the FEM modeling results and the physical simulation results in a soil bin shows that the accuracy of forward simulation can meet the requirement,and the vertical focused device can attain the purpose of focused advanced detection.The results of simulated complex models under the condition of vertical focused observation show that the scheme can effectively detect ill geological bodies in front and side tunnels.
出处 《物探与化探》 CAS CSCD 北大核心 2011年第3期419-422,共4页 Geophysical and Geochemical Exploration
基金 国家自然科学基金项目(40774057) 广西科学基金项目(桂科自0832263)资助
关键词 坑道电阻率法 超前探测 有限元数值模拟 垂直聚焦 tunnel resistivity method advanced detection finite-element numerical modeling vertical focus
  • 相关文献

参考文献9

二级参考文献30

共引文献208

同被引文献48

  • 1徐振超,敬荣中.坑道电法在东川矿区的应用效果[J].矿产与地质,1993,7(6):454-458. 被引量:1
  • 2贾晓峰,胡天跃,王润秋.复杂介质中地震波模拟的无单元法[J].石油地球物理勘探,2006,41(1):43-48. 被引量:18
  • 3何继善,柳建新.隧道超前探测方法技术与应用研究[J].工程地球物理学报,2004,1(4):293-298. 被引量:52
  • 4李金铭.地电场与电法勘探[M].北京:地质出版社,2007.1-473
  • 5傅良魁.电法勘探教程[M].北京:地质出版社,1982..
  • 6黄俊革,王家林,阮百尧.坑道大极距偶极电阻率测深异常特征[J].地球物理学进展,2007,22(6):1935-1941. 被引量:10
  • 7Key K, Weiss C. Adaptive finite-element modeling using unstruc- tured grids: The 2D magnetotelluric example [ J ]. Geophysics, 2006,71(6) :291 299.
  • 8Ren Z Y ,Tang J T.3D direct current resistivity modeling with un-structured mesh by adaptive finite-element method [J]. Geophysics, 2010,75 ( 1 ) : 7 - 17.
  • 9Kaus A, Boening W. BEAM-geoelectrical ahead mo- nitoring for TBM-drives[J]. Geomechanics and Tun- neling, 2008, 1(5): 442-450.
  • 10Kopp T. Real-time monitoring of geological condi- tions during mechanized tunneling by means of beam4 method[C]//Proc of Eastern European Tunneling Conference. Budapest: [s. n. ], 2012. 18-21.

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部