某水电站库区滑坡滑速涌浪计算 被引量:7

CALCULATING SLIDING SPEED AND SURGE HEIGHT OF UNSTABLE SLOPES IN A RESERVOIR
原文传递
导出
摘要 对雅砻江流域某拟建电站库区边坡失稳后的滑速和涌浪高度进行计算。计算滑速采用潘家铮条分法,涌浪高度计算同时采用水科院经验公式法和潘家铮法两种方法。综合两种方法的计算结果获得库坝处滑坡产生的涌浪高度为0.41~0.88m,对拟建工程影响较小。此计算分析方法对类似工程具有借鉴意义。 A hydropower station is to be constructed on the Yalong River. Pan Jia-zheng slice method is used to calculate the speed of possible landslides in the unstable slopes in the reservoir. But the height of their surges is worked out using Empirical formula method by IWHR and Pan Jia-zheng method as well. Based on the two results, the surge height is acquired as 0.41- 0. 88 m by the future dam which exerts little effect on the project to be built. This calculation-analysis method serves as a reference for similar projects.
作者 包祎 唐兴君
出处 《地质灾害与环境保护》 2011年第1期36-40,共5页 Journal of Geological Hazards and Environment Preservation
关键词 滑坡 滑速 涌浪高度 潘家铮法 经验公式法 Landslide Sliding speed Surge height Pan Jia zheng method Empirical formula method
  • 相关文献

参考文献4

二级参考文献4

共引文献50

同被引文献25

引证文献7

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部