世博会园区利用泵闸海漫段作为连续箱梁支架基础施工技术

Construction Technology of Utilizing Pump and Sluice Gate Sea-overflow Section as Bracket Foundation of Continuous Box Girder in Shanghai Expo Site
在线阅读 下载PDF
导出
摘要 世博会园区浦明路桥与白莲泾泵闸工程属于白莲泾河口属同一施工区域,采用导流明渠和拦河围堰形成陆域后进行施工。该文介绍了利用泵闸海漫段作为连续箱梁支架基础施工技术,有关经验可供相关专业人员参考。 Puming Road Bridge and Bailianjing Pump and Sluice Gate Project in Expo Site belong to a same construction area,where to be constructed after the open channel diversion and barrage cofferdam are used to form land.The article introduces the construction technology of utilizing the pump and sluice gate sea-overflow section as the bracket foundation of continuous box girder.The relative experience can be referred for the relative professional members.
作者 田黎
出处 《城市道桥与防洪》 2011年第1期89-91,8-9,共3页 Urban Roads Bridges & Flood Control
关键词 桥梁工程 支架基础 利用泵闸海漫段 施工技术 bridge engineering bracket foundation utilizing pump and sluice gate sea-overflow section construction technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部