漫湾电站二期工程岩锚梁开挖保护措施研究 被引量:4

Research of Protection Measures on Rock Bolt Crane Girders Excavation in the Second Phase Project of Manwan Hydropower Station
在线阅读 下载PDF
导出
摘要 岩锚梁是漫湾电站二期工程地下厂房施工中的关键部位,其开挖质量关乎着整个工程的安全与工期。为确保其开挖质量,在对工程情况具体分析的基础上,结合地下厂房岩锚梁区域第Ⅲ层中部拉槽开挖施工,进行了5组典型爆破工况试验。5种爆破工况基本代表了对岩锚梁存在影响的开挖爆破,试验数据代表性强、可靠度高,所回归出的爆破振动衰减规律不仅代表了存在的多种地质条件,还具有较高的准确度。在试验分析的基础上,给出了以岩锚梁为保护对象的开挖保护措施,为工程的顺利完成提供了重要的技术支撑。 The rock bolt crane girders is the key construction part in the second phase project of Manwan hydropower station,its excavation quality decides the whole construction security and days for construction.To ensure the quality of excavation,combining the central trenching excavation in third layer of the rock bolt crane girders area of the underground powerhouse,five typical blast condition tests have carried out on the basis of site situation.This five groups of blast′s condition basically reflect the blasting impact on rock bolt crane girders,the test data has strong representation and high reliability,the regressed attenuation law of blasting vibration has not only reflected the practical various geological condition,but also has high accuracy.Based on the test analysis,a series of protect measures for rock bolt crane girders as protect object are given,and provide important technical surpport for the project's successful completion.
出处 《爆破》 CSCD 北大核心 2011年第1期53-57,共5页 Blasting
关键词 岩锚梁 漫湾电站 地下厂房 开挖 爆破 保护措施 rock bolt crane girder Manwan hydropower station underground powerhouse excavation blasting protection measure
  • 相关文献

参考文献13

二级参考文献21

  • 1季月伦.地下厂房的爆破振动观测[J].爆破,1995,12(2):40-40. 被引量:2
  • 2高正中,张青云,王波.坝体混凝土胶结面力学特性试验研究[J].四川水力发电,1996,15(3):45-49. 被引量:2
  • 3Lien R,Kristiansen J,Pran L S.Suspended support for crane rails in Norwegian underground power-houses[J].Internationai Water Power and Dam Construction,1990,42(4):48-50.
  • 4Johansen P M.Model field tests on crane rail beams at Skjomen and Kvilldal power stations[R].Oslo,Norway:Norwegian Geotechnical Institute,1984.
  • 5Stokkebo O,Tondevold E.Designing for year-round efficiency at ulla-forre[J].International Water Power and Dam Construction,1978,30(8):23-28.
  • 6Gill R D,Lawrenson D S.Underground works at Kenya's Kiambere Project[J].International Water Power and Dam Construction,1986,38(5):13-16.
  • 7Wang X,Solymár Z V.Design and underground construction at the Xiaolangdi multipurpose dam site[J].Tunneling and Underground Space Technology,1997,12(4):461-472.
  • 8Mehta P K.Concrete Structure,Properties and Materials,Prenticehall[M].New Jersey,USA:Inc.Englewood Cliffs,1986.
  • 9Liao K Y,Chang P K,Peng Y N.A study on characteristics of interfacial transition zone in concrete[J].Cement and Concrete Research,2004,30(6):977-989.
  • 10Cowper G R,Symonds P S.Strain-hardening and strain-rate effects on the impact loading of cantilever beams[R].Providence,USA:Division of Applied Mathematics,Brown University,1957.

共引文献148

同被引文献20

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部