摘要
简要介绍了秦山核电二期工程反应堆热工水力设计的设计基础和设计方法,反应堆压力容器内压降和旁流计算,燃料组件热工水力设计,以及堆芯功率控制和DNBR限值分析等内容。同时进行了设计验证,验证结果表明,设计计算结果与水力模结果符合良好。
The bases and methods of thermal hydraulic design for fuel assemblies、pressure drop and bypass flowrates in reactor vessel、as well as core control and departure from nucleate boiling ratio(DNBR) limit analysis for Qinshan phase Ⅱ reactor are presented briefly.And then design checking are made,checking results indicate that the calculation results is coincident with model test results.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1999年第4期308-312,共5页
Nuclear Power Engineering
关键词
秦山核电站
反应堆
热工水力
设计验证
Qinshan phase Ⅱ nuclear power project Reactor thermal hydraulic Design check