Progress billing method of accounting for long-term construction contracts
Progress billing method of accounting for long-term construction contracts
摘要
This article questions the reliability of the amount of revenue recognized in the percentage of completion (POC) method of revenue recognition in construction industry and recommends a new method based on the progress billing which is more reliable. The most commonly used method of revenue recognition in the construction industry is the percentage of completion method (POC), where the revenue is recognized on the basis of the percentage of work completed. The calculation of percentage of work completed is made on the basis of the cost incurred for the contract work during the financial period and the cost required for completion of the work as estimated by the contractor. Here, the acceptance of the product by the buyer (contractee) is not involved in recognizing the revenue. The reliability of the amount of revenue and its collectability can be assured only when the buyer accepts the product. The approval of the progress bill by the contractee is needed to assure the reliability and collectability and it must be the event that triggers the recognition of revenue.
参考文献18
-
1AASB. (2004). Framework for the preparation and presentation of financial statements.
-
2AASB. (2007). Revenue.
-
3Beckman, J. & Koczan, M.. (2006). The FASB's revenue recognition project: Pervasive issues in long-term contract accounting. Construction Accounting & Taxation, 16(4), 35.
-
4Bernstein, L. A.. (1992). A financial analyst's guide to accounting quality. Business Credit, 94(2), 1.
-
5Frank, B.. (1987). The best accounting method: Completed contract or percentage of completion. The National Public Accountant, 32(6), 24.
-
6Hawkins, R. L.. (1989). Planning for long-term contracts after TAMRA. Journal of Accountancy, 70(1-6).
-
7Herwitz, D. R.. (1957). Accounting for long-term construction contracts: A lawyer's approach. Harvard Law Review, 170, 449-478.
-
8Kelley, A. C.. (1995). Long-term construction type contract. Accounting Research Bulletine, no. 45, para 15.
-
9Kieso, D. E., Weygandt, J. J., Trry, D. & Warfield, T. D.. (2001). Intermediate accounting (10th ed.). John Wiley & Sons, Inc..
-
10Larson, R. K. & Brown, K. L.. (2001). Lobbying of the international accounting standards committee: The case of construction contracts. Advances in International Accounting, 14, 47-73.
-
1刘琨.我国与荷兰建造合同会计准则之比较[J].对外经贸财会,2006(1):49-50.
-
2杨红丽.EVA——企业绩效评价的应用[J].辽宁经济,2006(12):97-98.
-
3郝凤英.拆迁款项知多少[J].北京房地产,2002(4):37-41.
-
4李丹锋.一部“事件”触发的历史[J].时代建筑,2011,54(3):152-152.
-
5朱兰的不朽贡献[J].品质.品牌,2004(12):29-29.
-
6只有一半会成功[J].经济管理文摘,2007(11):24-24.
-
7彭莉莎.工业增加值中“辅助生产费用”计算存在的问题及改进[J].统计教育,2006(8):21-23.
-
8寿焘,程啸.场域通道——事件触发概念下的建筑地域性建构探究[J].建筑与文化,2016(10):118-119. 被引量:3
-
9小而美取代大而不当[J].领导决策信息,1998,0(17):23-23.
-
10应小陆.所得税会计处理:新准则与旧规范的比较分析[J].上海金融学院学报,2007(1):61-65. 被引量:2