锦屏二级水电站深埋长隧洞群的建设和工程中的挑战性问题 被引量:42

CHALLENGE ISSUES IN CONSTRUCTION AND PROJECT OF LARGE-SCALE DEEP-BURIED TUNNEL GROUP OF JINPING Ⅱ HYDROPOWER STATION
在线阅读 下载PDF
导出
摘要 锦屏二级水电站大型深埋隧洞群由4条引水隧洞、2条辅助洞及1条施工排水洞组成,隧洞群总长约118 km,具有埋深大、洞线长、洞径大、地应力水平高、工程地质条件极其复杂、施工布置困难等特点,是目前世界上己建、在建总体规模最大、综合难度最大的水工隧洞群工程。隧洞群建设中面临地下水预报与处理、岩爆防治等关键技术问题。通过对锦屏二级水电站深埋隧洞群建设中遇到岩爆及突涌水工程治理等工程应用实例进行研究总结,提出下一步工程中所面临的挑战及应对措施。锦屏二级水电站工程深埋长隧洞的建设所取得的经验,可为类似工程提供有益的借鉴。 Jinping Ⅱ hydropower station includes four diversion tunnels,two auxiliary tunnels and one drainage tunnel,with a total tunnel length of 118 km.These tunnels are characterized as thick overburden,long length,large size in diameter,high geostress,complicated engineering geological conditions and high difficulty for project layout,which make the tunnel project the largest and most difficult hydro-tunnel group in the world.Key technical problems were met during the tunnels excavation,including the forecast and treatment of groundwater,and the prevention of rock burst.The studies and measures adopted against rock burst,the gushing water and the instability of surrounding rock mass during the construction of tunnels are summarized.The experience accumulated during the construction of the tunnels in Jinping Ⅱ hydropower station shall provide valuable reference for similar projects.
作者 吴世勇 王鸽
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2010年第11期2161-2171,共11页 Chinese Journal of Rock Mechanics and Engineering
基金 国家自然科学基金 雅砻江水电开发联合研究基金资助项目(50539090) 国家自然科学基金资助项目(10945002)
关键词 隧道工程 锦屏二级水电站 地下工程 岩爆 地下水 tunnelling engineering Jinping Ⅱ hydropower station underground engineering rock burst groundwater
  • 相关文献

参考文献14

二级参考文献103

共引文献862

同被引文献824

引证文献42

二级引证文献366

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部