期刊文献+

预应力混凝土箱梁桥施工过程中底板崩裂破坏机理分析 被引量:33

Failure Mechanism Analysis of Bottom Plate of Prestressed Concrete Box Girder Bridge During Construction
原文传递
导出
摘要 针对悬臂施工预应力混凝土箱梁合龙过程中底板崩裂问题,对其破坏机理和防治措施进行了研究。以某预应力混凝土连续箱梁桥为例,对其施工过程进行模拟,通过考虑材料非线性对底板开裂的过程进行仿真分析,并对底板崩裂的机理进行分析,在此基础上根据规范提出防治措施供设计应用。结果表明:由于合龙束孔道的影响,孔肋为受力最不利区域,在径向力作用下,孔肋的斜裂缝和撕裂裂缝是导致箱梁破坏的主要原因;在今后箱梁设计中,底板横向除应满足抗剪承载力外,孔肋尚需满足最小孔道间距的要求。 Aimed at problem on failure of bottom plate of prestressed concrete box girder bridge during cantilever construction,its failure mechanism and prevention measure were studied.Taking a prestressed concrete box girder bridge as example,construction process of the box girder was simulated.Considering material nonlinear,the process of bottom plate crack was simulated and failure mechanism of bottom plate was analyzed.Based on it,according to code,prevention measure was proposed and was applied to practice.The results indicate that the rib is in the worst mechanical area.Failure of box girder is mainly induced by extending of diagonal and tearing crack of rib under effect of radial force.In the future design of box girder,transverse bottom plate should support anti-shear bearing capacity,rib should satisfy the requirement of minimum duct space.
出处 《中国公路学报》 EI CAS CSCD 北大核心 2010年第5期70-75,共6页 China Journal of Highway and Transport
基金 浙江省交通厅科技项目(2008H38)
关键词 桥梁工程 预应力混凝土箱梁 仿真分析 施工过程 破坏 材料非线性 bridge engineering prestressed concrete box girder simulated analysis construction process failure material nonlinear
  • 相关文献

参考文献12

  • 1PODOLNY W J. The Cause of Cracking in Post Tensioned Concrete Box Girder Bridges and Retrofit Procedures[J].PCI Journal, 1985,30(2) :82-139.
  • 2CHATELAIN J, GODART B, DUCHENE J L. Detection, Diagnosis, and Monitoring of Cracked Pres tressed Concrete Bridges [C]//NOWAD A S. Proceedings of the NATO Advanced Research Workshop on Bridge Evaluation,Repair and Rehabilitation. Dordrecht : Kluwer Academic Publishers, 1990 : 145-159.
  • 3MOON D Y,SIM J, OH H. Practical Crack Control During the Construction of Precast Segmental Box Girder Bridges[J]. Computers & Structures, 2005,83 (31/32) :2584-2593.
  • 4黎增丰,涂常卫,钟伟坚,杨慧光.潭洲大桥箱梁底板砼开裂事故处理[J].中南公路工程,1997,22(4):35-40. 被引量:6
  • 5何海.变高度预应力混凝土箱梁桥底板纵向裂缝成因分析及防治[J].中南公路工程,2001,26(3):61-62. 被引量:44
  • 6魏乐永,沈旭东,肖汝诚,谭红梅.预应力混凝土连续箱梁底板崩裂破坏的机理及其对策[J].结构工程师,2007,23(2):53-57. 被引量:34
  • 7彭元诚.连续刚构箱梁底板崩裂原因分析与对策[J].桥梁建设,2008,38(3):67-70. 被引量:56
  • 8浙江大学,浙江省公路管理局.预应力混凝土连续箱梁底板开裂原因分析及防治研究报告[R].杭州:浙江大学,2009.
  • 9HOGNESTAD E, HONSON N W, MCHENRY D. Concrete Stress Distribution in Ultimate Strength De sign[J].ACI Journal Proceedings, 1955,52 (12) : 455- 480.
  • 10AL-MANASEER A A, PHILLIPS D V. Numerical Study of Some Post-cracking Material Parameters Affecting Nonlinear Solutions in RC Deep Beams[J]. Canadian Journal of Civil Engineering, 1987,14 (5) : 655-666.

二级参考文献7

共引文献1957

同被引文献189

引证文献33

二级引证文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部