针对变电站综合自动化系统在变电站中应用的实际情况,结合四方公司研发的CSC2000变电站综合自动化系统,从系统的总体分层结构、通讯网络、系统功能等多方面介绍了变电站综合自动化系统设计配置要求。针对CSC2000在实际应用中出现的一些缺陷,提出了对应的改进措施,提高了变电站运行的可靠性。
In view of the actual application effect of the integrated substation automation system,in combination with the CSC2000 substation integrated automation system researched by Sifang Company.The design dispostiton requirement of the integrated automation system is introduced form the system's overall stratification structure,communication networks,system function and other aspects of the system.Aimming at the shortcomings of practical application about CSC2000 system,many corresponding improvement measures are proposed to enhance the operating reliability of the substation.