兰渝铁路西秦岭隧道TBM步进技术 被引量:25

Case Study on TBM Stepping Modes in West Qinling Tunnel on Lanzhou-Chongqing Railway
在线阅读 下载PDF
导出
摘要 根据西秦岭隧道钻爆法与TBM掘进法施工相结合的实际情况,提出TBM经过钻爆施工段的步进方案。通过介绍油缸推进、弧形滑道步进与电机驱动、整体托架步进这2种步进方法的技术特点、控制重点和详细的施工方法并对各自的优缺点进行比较,最终选择油缸推进、弧形滑道步进施工方案。 West Qingling tunnel is constructed by TBM tunneling method assisted by drill and blast method. The stepping of TBM through the tunnel section constructed by drill and blast method is presented. The mode of stepping with arc-shaped slide way and thrust cylinder and the mode of stepping with integral support frame and electrical motor drive are described in terms of technical features, key control points and operation methods. The two stepping modes are compared in terms of advantages and disadvantages. Finally, the mode of stepping with arc-shaped slide way and thrust cylinder is chose.
作者 陈大军
出处 《隧道建设》 2010年第2期162-168,178,共8页 Tunnel Construction
关键词 西秦岭隧道 TBM 弧形滑道 电机驱动 步进技术 West Qinling tunnel TBM arc-shaped slide way electrical motor drive stepping technology
  • 相关文献

参考文献10

二级参考文献13

  • 1齐梦学.TB880E型掘进机施工速度分析[J].建设机械技术与管理,2005,18(9):78-82. 被引量:2
  • 2高振宅.浅谈TB880E型掘进机施工参数的选择[J].辽宁科技学院学报,2007,9(1):25-26. 被引量:4
  • 3.TBJ 3-85.铁路隧道设计规范[S].,..
  • 4傅德明 朱金林.岩石隧道掘进机施工技术[R].上海:上海隧道工程股份有限公司施工技术研究所科技情报室,1997..
  • 5.TBM通过特硬岩、岩爆地段的施工技术[A]..隧道掘进机TBM施资料(第5册)[R].隧道工程局科研所信息室,1997..
  • 6.秦岭隧道掘进机通过坍方地段的对策[A]..秦岭隧道TBM施工专题情报资料(第21期)[R].隧道工程局科研所信息室,1999..
  • 7梁文灏 等.秦岭特长隧道采用TBM施工设计方案综述[A]..国内外隧道掘进机文献汇集[C].铁科院西南分院信息研究室,1998..
  • 8.西安南京铁路A±-13标磨沟岭隧道工程地质勘测报告[R].,..
  • 9.磨沟岭隧道工程施工技术总结[R].,..
  • 10中华人民共和国铁道部.TB10204-2002铁路隧道施工规范[S].北京:中国铁道出版社,2002.

共引文献59

同被引文献129

引证文献25

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部