4Bourjault A, Lhote A. Modelling an assembly process[A]. In: IEEE International Conference on Automation of Manufacturing Industry [C]. 1986. 183-198.
5Homem de Mello L S, Sanderson A C. A correct and complete algorithm for the generation of mechanical assembly sequences [J]. IEEE Transaction on Robotics and Automata ion, 1991, 7(2): 228-240.
6Ko H, Lee K. Automatic assembling procedure generation from mating conditions [J]. Computer Aided Design, 1987, 19(1): 3-10.
7Dini, G, Santochi M. Automated sequencing and subassembly detection in assembly planning [J].Annals of the CIRP, 1992, 41: 1-4.
8Huang Y M, Huang C T. Disassembly matrix for disassembly processes of products [J]. International Journal of Production Research, 2002, 40 (2):255-273.
9De Fazio T L, Whitney D E. Simplified generation of all mechanical assembly sequences [J]. IEEE Journal of Robotics and Automation, 1987, 3(6): 640-658.
10Baldwin D F, AbelL T E, et al. An integrated computer aid for generating and evaluating assembly sequences for mechanical products [J]. IEEE Transactions on Robotics and Automation, 1991,7(1): 78-94.