摘要
以贵州乌江流域梯级水电站水情自动测报系统为例,从系统通信组网方案设计、传感器对比及选择等方面综合分析了国内大型流域梯级电站水情自动测报系统的建设情况,设计实现了对大型流域梯级电站水情的分段监测维护和统一调度管理。
Taking the hydrologic data acquisition system of Guizhou Wujiang valley cascade hydropower stations for example, this paper analyzes the constructing status of hydrologic data acquisition system for domestic large-valley cascade hydropower stations, with more emphasis placed on the design of communication network and the selection of sensors. The system proposed can help realize centralized dispatching and decentralized supervision of the project.
出处
《水电自动化与大坝监测》
2010年第1期66-68,共3页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
大型流域
梯级水电站
水情自动测报系统
遥测通信组网
传感器
large-valley cascade hydropower stations
hydrologic data acquisition system
telemetry communication network
sensors