摘要
论述了环境与岩土工程之间相互作用和相互影响的关系,通过黄土路基由于长期浸水而引起的路基不均匀沉降的工程实例说明周围环境变化对岩土工程的影响,并提出了灰土挤密桩加上地基劈裂压浆联合加固地基的处理措施。
This paper explores the relation of mutual effect and interaction between environment and geo-environmental engineering and explains the influence of ambient environmental change on geo-environmental engineering through engineering examples of uneven subgrade settlement due to long-term soaking of loess subgrade as well as puts forward the treatment measures of joint reinforced foundation with lime-soil compaction pile combined foundation fracture grouting.
出处
《路基工程》
2010年第1期106-108,共3页
Subgrade Engineering
关键词
环境岩土工程
黄土湿陷
路基
沉降
geo-environmental engineering
loess collapse
subgrade
settlement