文章将基于线性规划的Benders分解法应用于电力系统无功规划问题。根据该方法,以年费用最小为目标函数,将优化问题分解为投资主问题与运行子问题,并在两个问题间迭代求解。该方法为无功规划提供了新的思路。对某66节点系统的负荷节点的无功优化结果表明,该方法具有实用性。
Benders decomposition based on linear programming is applied in reactive power planning in this paper. According to this method, the optimization problem is decomposed into an investment subproblem and an operation subproblem, and the solution is determined by iterative procedure between both problems. This method provides a new alternative to reactive power planning. The result of the load reactive power planning for a 66 nodes system shows that this method is feasible.
出处
《电网技术》
EI
CSCD
北大核心
1998年第11期30-33,共4页
Power System Technology