摘要
结合工程设计实际情况,对铁道部规定的综合接地设计方案中没有明确的明挖隧道、盾构隧道的综合接地方案进行了研究,可供相关项目借鉴。
Based on actual engineering design experience, the article studies integrated earthing scheme for open-dig tunnel and shield-dig tunnel, which are not included in the MOR standard and can be use as reference for other similar projects.
出处
《铁道通信信号》
2009年第10期21-23,共3页
Railway Signalling & Communication
关键词
隧道
综合接地
方案
Tunnel
Integrated earthing
Solution