摘要
介绍了华菱(集团)衡阳钢管有限公司从达涅利引进的90t电炉+LF+VD+弧形连铸生产线的主体设备情况。详细地分析了气瓶管从废钢→电炉→精炼→真空处理→圆坯连铸的过程质量控制状况。气瓶管的过程质量控制严格,实物质量满足国内和国外标准要求。
The paper describes the principal equipments of the 90 t EAF + LF + VD + CC production line Valin Hengyang Steel Tube Co. , LTD has introduced from Danieli and analyses in detail the process quality control of gas bottle tube from scrap through EAF, LF and VD to CC. Process quality control of gas bottle tube is very strictly implemented and the physical quality of the products can meet the requirement of the standards at home and abroad.
出处
《炼钢》
CAS
北大核心
2009年第3期22-24,共3页
Steelmaking
关键词
气瓶管
圆坯
过程质量控制
gas bottle tube
round billet
process quality control