摘要
针对高压井(负压井)、大斜度井、水平井测试易出现的问题,提出测试作业时,将工具放入斜度较小的井段作业,收集分析施工数据,再逐步推进到大斜度井段作业的方案。针对不同的井况和工具情况,提出了相应的解决方案。
To deal with some problems often occurring in high pressure well (negative pressure well),deviating well or horizontal well,a test program is proposed,which is putting the tools at the place in the wellbore where the deviation is slight and acquiring test data there,then moving the tools progressively to the place in the wellbore where the deviation is more serious and acquiring test data there again. Different appropriate solving plans are given for different well status and tools conditions.
出处
《油气井测试》
2009年第1期60-61,共2页
Well Testing
关键词
负压井
大斜度井
钻柱地层测试
经验
negative pressure well,deviated well,drill stem test,experience