摘要
提出了径流式水电站安装时序容量的概念和计算方法。实例表明,在水电站装机容量规划设计中充分考虑安装时序容量可明显提高水电站经济效益。
This paper introduces the concept and the method of calculating installation sequential capacity for run-of- river hydropower stations. We illustrate the point with an example that we can raise the economic benefits obviously, con sidering the installation sequential capacity during the designing period of the planned capacity of hydropower stations.
出处
《水电能源科学》
2008年第5期160-162,共3页
Water Resources and Power
关键词
径流式水电站
安装时序容量
经济效益
run-of-river hydropower station
installation sequential capacity
economic benefits