期刊文献+

医院动力设备集群监控系统开发中应用项目管理方法的探讨 被引量:1

Discussion on applying profect management methods to the development of power equipment cluster monitoring system of hospital
在线阅读 下载PDF
导出
摘要 医院后勤设备开发项目具有设备品种多、数量少、流程复杂、跨部门流程多等特点,因此经常受到来自多方面因素的影响。这些影响对项目的时间、成本、质量等控制目标是不利的。文章通过对医院在变配电系统、热力系统等动力设备集群监控系统建设中引入项目管理方法的介绍,阐述了应用项目管理方法对提高医院后勤设备开发项目成功率的作用。 The development project of hospital logistical equipment has the characteristics with much eqipment varitty and few quantities, complex progress and many trons-department flows. Consequently, it was influenced by various factors. These influences are disadvantageous to control objectives such as project time, cost and quality. This paper introduced the project management method and their effective to increase the success rate of logistical equipment development project.
作者 黄巍 王林
出处 《中国卫生质量管理》 2008年第5期51-54,共4页 Chinese Health Quality Management
关键词 医院 设备 项目 管理 Hospital Equipment Project Management
  • 相关文献

参考文献5

  • 1李伟洪.信息系统工程监理与项目管理的比较[J].现代计算机,2006,12(3):62-64. 被引量:3
  • 2.Quality manage-ment systems-Guidelines for quality management in projects[].ISO:.
  • 3James P·Lewis.The project Manager‘s Desk Reference[]..2000
  • 4Capers Jones.Assessment and Control of Software Risks[]..1994
  • 5Jack Gido,James P Clements.Successful Project Management[]..2003

二级参考文献1

  • 1Project Management Institute. A Guide to the Project Managemnet Body of Knowledge Third Edition,2004, USA

共引文献2

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部