摘要 Because connection number can express and process synthetic uncertainties caused by various uncertainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples. Because connection number can express and process synthetic uncertainties caused by various un- certainties in the transmission network planning, a connection number model (CNM) was presented to compare the values of connection number logically. This paper proposed a novel model for transmission network flexible planning with uncertainty. In the proposed planning model both certainty and uncertainty information were included, and the cost-benefit analysis method was used to evaluate the candidate schemes in the objective function. Its good adaptability and flexibility were illustrated through two examples.
出处 《Journal of Shanghai Jiaotong university(Science)》 EI 2008年第4期436-442,共7页 上海交通大学学报(英文版)
基金 the National Natural Science Founda-tion of China (No. 50177017) the Shanghai Key Scienceand Technology Research Program (No. 041612012)
关键词 transmission network planning UNCERTAINTY flexible planning connection number connection number model (CNM) blind number 电力系统规划 网络技术 不确定性 数字模型
  • 相关文献

参考文献11

  • 1金华征,程浩忠,杨晓梅,王旭.模糊集对分析法应用于计及ATC的多目标电网规划[J].电力系统自动化,2005,29(21):45-49. 被引量:19
  • 2Torre T D,Feltes J W,San Roman T G, et al.Deregulation, privatization, and competitions: transmission planning under uncertainty[].IEEE Transactions on Power Systems.1999
  • 3Van Geert E.Increased uncertainty a new challenge for power system planners[].IEE Colloquium on Toolsand Techniques for Dealing with Uncertainty.1998
  • 4Miranda V,Proenga L M.Probabilistic choice vs. risk analysisconicts and synthesis in power system planning[].IEEE Transactions on Power Systems.1998
  • 5Crousillat E O,Dorifner P,Alvarado P, et al.Conicting objectives and risk in power system planning[].IEEE Transactions on Power Systems.1993
  • 6Jiang Y,Xu C,Liu Y, et al.A new approach for representing and processing uncertainty knowledge[].IEEE International Conference on Information Reuse and Integration.2003
  • 7Huang D,Zhao K,Zhang P.Uncertainty network planning technique using the connection number a+bi of set pair analysis[].Proceedings of the rd World Congress on Intelligent Control and Automation (WCICA).2000
  • 8Chowdhury A A,Koval D O.Application of customer interruption costs in transmission network reliability planning[].IEEE Transactions on Industry Applications.2001
  • 9Fang Risheng,Hill D J.A New Strategy for Transmission Expansion in Competitive Electricity Markets[].IEEE Transactions on Power Systems.2003
  • 10Jaeseok Choi,El-Keib AA,Tran T.A Fuzzy Branch and Bound-based Transmission System Expansion Planning for the Highest Satisfaction Level of the Decision Maker[].IEEE Transactions on Power Systems.2005