对水泥窑低温余热发电问题评述 被引量:5

Review of several issues of cement kiln low-temperature Cogeneration
在线阅读 下载PDF
导出
摘要 水泥窑低温余热发电系统的方案优劣,不能单纯采用"吨熟料发电量"这一个指标。文章详细分析了原料磨种类、原料水分、烘干气体温度、煤磨位置、增湿塔位置、预热器级数对发电量的影响,以及为追求高发电量而影响原水泥生产线正常运行的诸多不利状况。在此基础上,作者对行业内存在热点问题进行了相关的剖析。 The good or bad of a cement kiln low-temperature Cogeneration system proposal can not only be judged by " power generation per ton clinker" only. This article provides detailed analysis the influence of some parameters including to power producing amount, furthermore, the author points out several impact made by the unbalanced pursuit of high power creation amount on the original cement production line. Based on this analysis, the author presents related review of hot issues in the field of cement industry.
出处 《水泥工程》 CAS 2008年第3期65-70,共6页 Cement Engineering
关键词 水泥窑低温余热发电 预热器 冷却机 煤磨 增湿塔 SP炉 AQC炉 方案评价 Cement kiln low-temperature Cogeneration Preheater Cooler Coal mill Conditioning tower SP boiler AQC boiler Proposal evaluation
  • 相关文献

参考文献2

共引文献7

同被引文献16

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部