摘要
结合国电集团大同二电厂二期600 MW机组石灰石—石膏湿法烟气脱硫工艺工程实例,介绍了该工艺吸收塔系统的反应原理,分析了该吸收塔的设计要点,总结了该吸收塔设计的特点,对国内同类大型火电机组选用湿法烟气脱硫工艺提供一定的借鉴意义。
The absorber svstem is the fundamental part in the wet FGD system. The desulphurization steps of FGD device in the 600 MW unit is introduced, and the design of the absorber system is analyzed. Besides, the characteristics of this project, which is a good reference for future design and operation of FGD in other power plants is summarized.
出处
《山西电力》
2008年第2期40-42,共3页
Shanxi Electric Power