1998年西宁供电公司开始实施"一户一表"工程,对配电线路、变电器、接户线等进行了改造并更换大容量电能表,然而个别新装电能表出现转"快"的现象。文章针对这一现象从多方面进行了分析,并提出了行之有效的解决措施。
It implements "one Family,one Meter" project of Xining Electricity Supply Bureau since 1998, it rebuilds distribution line, transformer, connection user- line etc. and changes large - capacity energy meter, but several new- installed energy meters appear fast turn phenomenon. The paper analyses the phenomenon from several aspects,and brings forward effective solutions.
出处
《青海电力》
2007年第3期46-49,共4页
Qinghai Electric Power
关键词
电能表
误差
分析
energy meter
error
analysis