基于模糊FoM的装备软件寿命周期费用评价方法 被引量:1

Method of Lifecycle Cost Assessment of Equipment Software Based on Fuzzy FoM
在线阅读 下载PDF
导出
摘要 由于在装备软件开发过程中存在大量的不确定性需求和许多未知因素,导致使用传统的寿命周期费用(lifecyclecose,LCC)评价方法很难处理评价中的模糊属性。为解决这一问题,提出了一种评价方法——模糊优劣指数评价法(fuzzy figure of merit,FFoM)。FFoM方法不仅能够处理定量的系统属性,而且能够处理模糊定性的系统属性。FFoM方法的主要思想是,用模糊隶属函数替代传统优劣指数评价法(FoM)中的效用函数,建立相应备择方案的模糊评判矩阵,使用中心点距离法对模糊数排序,求解最佳备择方案。最后用FFoM方法对一算例进行分析计算,结果表明此评价方法具有可行性。 Since there are plenty of uncertainty requirements and a lot of unknown factors in the development of equipment softwares, it is not easy to handle fuzzy attributives in assessment by using conventional methods. To solve this problem, the paper presents an assessment method--the fuzzy figure of merit( FFoM), which can handle not only the quantitative system attributives, but also the qualitative attributives with fuzzy. FFoM uses the fuzzy membership function instead of the utility function in FoM. Therefore, we can establish the total fuzzy judgment matrix by system performance scores, and use distance index concept to compare fuzzy numbers ordering, then obtain an optimal alternative. At last, the paper illustrates the feasibility of this assessment process by analyzing and calculating an example.
出处 《装备指挥技术学院学报》 2007年第1期6-10,共5页 Journal of the Academy of Equipment Command & Technology
基金 国家自然科学基金资助项目(70272002)
关键词 寿命周期费用 模糊理论 评价方法 装备软件 lifecycle cost fuzzy theory assessment method equipment software
  • 相关文献

参考文献6

  • 1The standish group international.Annual CHAOS Report[EB/OL].[2006-05-10].http://secure.standishgroup.com/reports/
  • 2BOEHM B,BROWN A W,MADACHY R,et al.A software product line life cycle cost estimation model[C]// Proceedings of the 2004 International Symposium on Empirical Software Engineering (ISESE'04).Mary Land,2004:156-164.
  • 3DANIELS J,WERNER P W,BAHILL A T.Quantitative methods for tradeoff analyses[J].Syst Eng,2001(4):190-212.
  • 4LIU S S,CHEN A T,YANG C H.A GA-based fuzzy optimal model for construction time-cost trade-off[J],International Journal of Project Management,2001,19:47-58.
  • 5CHENG C H.A new approach for fuzzy numbers by distance method[J].fuzzy Sets and Systems,1998,95:307-317.
  • 6宁伟华,陈永革,田新华.软件可靠性与费用权衡[J].系统工程与电子技术,2002,24(11):117-119. 被引量:4

二级参考文献2

  • 1郑人杰.计算机软件测试技术[M].北京:清华大学出版社,1990.全书.
  • 2(美)Lyu Michael R 刘喜成等(译).软件可靠性工程手册[M].北京:电子工业出版社,1997..

共引文献3

同被引文献4

  • 1陈国卫.装备软件外包及其合同价格研究[D].武汉:海军工程大学,2008.
  • 2朱维军.装备软件寿命周期费用分析及其效能优化模型[A].耿俊豹,金家善.寿命周期费用技术与协调发展[C].长沙:国防科技大学出版社,2011:189-192.
  • 3宋太亮,白宪振.重视装备的经济可承受性,提高装备建设的质量和效益[A].金家善,耿俊豹.寿命周期费用技术与循环经济[C].武汉:湖北科学技术出版社,2009:5-11.
  • 4陈国卫,魏汝祥,吴琴.军用软件外包探讨[J].装备制造技术,2008(9):14-15. 被引量:5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部