期刊文献+

西藏年楚河冰川终碛湖溃决条件及洪水估算 被引量:33

Outburst Conditions of Moraine-Dammed Lakes and Their Flood Estimation in the Headwaters of the Nianchu River, Tibet
在线阅读 下载PDF
导出
摘要 利用遥感卫片和航片资料查清了西藏年楚河上游冰川终碛湖的数量、大小和分布,并对其中最大的3个冰湖进行了分析,确认其中的白湖为一典型危险冰湖,只要有合适的气候条件就可能发生溃决。通过冰湖实地考察,验证了室内分析成果,补充收集计算所需的资料,采用美国天气局的BREACH模型和计算机程序。 By means of satellite remote sensing images and aerial photos, the number, scale and distribution of moraine-dammed lakes in the headwaters of the Nianchu River are investigated. Three large lakes among them were analysed. The Bai Lake was recognized to be a typical dangerous lake that would burst in a favorable climatic condition. Field investigation was carried out to collect the necessary data and to verify the results analysed in doors. Outburst flood of the Bai Lake was estimated with USWB BREACH model and computer program.
出处 《冰川冻土》 CSCD 北大核心 1996年第4期347-352,共6页 Journal of Glaciology and Geocryology
关键词 冰川 终碛湖 溃决条件 洪水 moraine-dammed lake, dangerous glacier lake, glacier lake outburst flood
  • 相关文献

参考文献3

  • 1徐道明,冰川冻土,1988年,10卷,3期,284页
  • 2团体著者,西藏河流与湖泊,1984年
  • 3团体著者,西藏水利,1981年

同被引文献320

引证文献33

二级引证文献343

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部