阶梯小水电站开发对永定河水质影响及防治对策 被引量:2

Impact of Cascade Power Stations on Water Quality of Yongding River and Its Countermeasures
在线阅读 下载PDF
导出
摘要 随着近年工业的发展,工业对电需求量急剧增加。永定县小水电站无节制开发,已对永定河水体造成一定的污染。监测结果表明,小水电站所在的河段水质比永定河其它断面污染严重,已经满足不了永定水环境功能区划的要求。 With the development of industry in recent years, electricity demand of industry increases sharply. But the construction of small power stations along Yongding River without limitation has already caused certain pollution to the waterbody of the river. Water quality of the river segment of small power station has not meet the requirement of environmental function due to more severe pollution than other segments.
出处 《四川环境》 2006年第4期87-90,共4页 Sichuan Environment
关键词 水质 小水电站 污染 防治 Water quality small power station pollution prevention and control
  • 相关文献

参考文献2

二级参考文献4

  • 1赵毓昆 袁定远.中国水力发电工程·规划经济卷[M].北京:电力出版社,2001..
  • 2沈磊.中国水力发电工程·运行管理卷[M].北京:电力出版社,2000..
  • 3汪恕诚.再论人与自然和谐相处-兼论大坝与生产(报告)[R].中国水利学会第八次代表大会,2004..
  • 4董哲仁.河流形态多样性与生物群落多样性[J].水利学报,2003,34(11):1-6. 被引量:253