介绍宁夏中宁发电厂330 MW锅炉的设计特点,该锅炉采用了自主开发的旋流燃烧器前后墙对冲布置的方式。阐述了锅炉本体设计和旋流燃烧器对冲布置的一些措施。性能试验和实际运行情况表明,该锅炉的设计是成功的。
The special design features of Ningxia Zhongning Power Plant are being explained. The boiler is fitted with whirl burners, developed by ourselves, inserted in the furnace's front and back wall, opposing each other. Some mearsures in design of the boiler proper and the arrangement of the burners are elucidated. Performance tests and actual operation have demonstrated the design to be a success. Figs 6, tables 2 and ref 1.
出处
《动力工程》
EI
CSCD
北大核心
2006年第3期346-350,共5页
Power Engineering
关键词
动力机械工程
锅炉
旋流燃烧器
对冲燃烧
power and mechanical engineering
boiler
whirl burner
opposed wall firing