水电站压力前池容积研究 被引量:5

Research on the forebay volume of hydropower station
在线阅读 下载PDF
导出
摘要 水电站压力前池是连接渠道与压力引水管的中间建筑物,具有调节和平稳水头之功用,其容积大 小、前池水面开阔程度对保证水电站的正常运行,改善水流流态至关重要。对已建工程前池容积特性的统计分析发 现,现有的压力前池功用微弱、相对投资较大,在技术和经济上很不合理。在广泛调研的基础上,经理论分析给出了 前池容积的“量化”计算方法,并从统计“众数”的角度,给出了相关尺寸确定的参考值,以避免前池容积确定的盲目 性和任意性。 The forebay of hydropower station,a middle building connecting the channel and the pressure pipeline,has the function of regulating and stablizing the head of water. Its size and degree of the surface of water width are crucial to guarantee the normal operation of power station and to improve the fluid state. The statistical analysis of characteristic of the completed project forebay shows that its function is weak and its investment is large, which is unreasonable in technology and economy. On the basis of extensive survey and study,the author finds the method to calculate the “quantity” of volume of the forebay by theoretical analysis and provides the reference value of the confirmed relevant size in “counting mode”,to avoid the blindness and wanton when the volume of the forebay is confirmed.
出处 《西北农林科技大学学报(自然科学版)》 CSCD 北大核心 2005年第12期143-147,共5页 Journal of Northwest A&F University(Natural Science Edition)
基金 杨凌职业技术学院研究基金项目(A42001001)
关键词 水电站 压力前池 前池容积 hydropower station forebay volume
  • 相关文献

参考文献7

  • 1[加]乔德里MH.实用水力过渡过程[M].成都:四川水力发电工程学会,1985..
  • 2王树人 刘天雄 彭天玫.水力发电站[M].北京:清华大学出版社,1983..
  • 3.中华人民共和国电力行业标准.水电站引水渠道及前池设计规范[M].北京:中国电力出版社,1998..
  • 4水电站机电设计手册编写组.水电站机电设计手册[M].北京:水利电力出版社,1983..
  • 5王世泽.水电站建筑物[M].北京:水利电力出版社,1987..
  • 6切尔陀乌索夫MI.水力学专门教程[M].上海:高等教育出版社,1958..
  • 7吴持恭.水力学[M].北京:高等教育出版社,1979.369.

共引文献53

同被引文献18

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部