摘要
阐述了鸡西电网的现状,针对恒山、密山、虎林地区供电可靠性较差以及鸡西电厂1号、2号机并网发电后,鸡西电网已由负荷性电网向电源性电网转变的要求,在现有网架的基础上提出了几种完善建议,并做了简单计算和分析。
The situation of Jixi Power grid was introduced, some improvement & perfection suggestions, calculation and analysis about it were presented based on the situation focusing on bad reliability of power supply in Hengshan , Mishan, Hulin area and the condition that Jixi power grid changes from load power grid to power source grid after the No. 1 and No. 2 power generation units wereput into use in the paper.
出处
《黑龙江电力》
CAS
2005年第5期351-353,356,共4页
Heilongjiang Electric Power
关键词
网架
可靠性
计算
分析
:grid
reliability
calculation
analysis