基于模糊神经网络的半导体生产线重调度策略优化 被引量:6

FUZZY NEURAL NETWORKS BASED RESCHEDULING STRATEGIES OPTIMIZATION OF SEMICONDUCTOR FABRICATION LINE
在线阅读 下载PDF
导出
摘要 针对缺乏半导体生产线重调度策略优化方法的研究现状,提出了基于模糊神经网络的半导体生产线重调度策略优化技术。将重调度策略划分为半导体生产线、设备组和设备重调度层次,利用仿真评价确定优化的重调度策略,并获得样本数据。通过对模糊神经网络训练,建立干扰和半导体生产线状态等输入参数与优化的重调度策略输出之间的映射关系。以上海某125mm晶圆生产线为例,结果表明了该重调度策略优化方法的有效性。 For the lack of rescheduling optimization approach for semiconductor fabrication line status in quo, a novel fuzzy neural networks based algorithm for rescheduling strategies optimization of semiconductor fabrication line is proposed. The rescheduling strategies are divided into line layer, machine group layer and machine layer. The samples for FNN are setup by simulation evaluation. The relation between the input of FNN, such as disturbance, system state parameters, and output of FNN, optimal rescheduling strategy, is built by FNN. With an illustrative example of a 152 mm semiconductor fabrication line in shanghai, the lineal regression between FNN output and targets demonstrates the effectiveness of the approach.
出处 《机械工程学报》 EI CAS CSCD 北大核心 2005年第10期75-79,共5页 Journal of Mechanical Engineering
基金 国家自然科学基金资助项目(50375098)。
关键词 半导体生产线 重调度 模糊神经网络 Semiconductor fabrication line Rescheduling Fuzzy neural networks
  • 相关文献

参考文献5

  • 1Uzsoy R, Lee C Y, Martin-Vega L A. A review of production planning and scheduling models in the semiconductor industry part Ⅱ: shop-floor control. IIE Transactions, 1994,26(5): 44~55
  • 2Toba H. Segment-based approach for real-time reactive rescheduling for automatic manufacturing control. IEEE Transactions on Semiconductor Manufacturing, 2000,13(3): 264~272
  • 3Abumaizar R J. Rescheduling job shops under random disruptions. International Journal of Production Research,1997, 35(7): 2 065~2 082
  • 4Li H. Production rescheduling expert simulation system. European Journal of Operational Research, 2000, 124(2):283~293
  • 5翟文彬,褚学宁,张洁,马登哲,金烨,严隽琪.基于组合拍卖的半导体生产线短期调度技术研究[J].机械工程学报,2004,40(9):95-99. 被引量:3

二级参考文献6

  • 1Uzsoy R, Lee C Y, Martin-Vega L A. A review of production planning and scheduling models in the semiconductor industry part II:shop-floor control. IIE Transactions, 1994, 26(5):44~55
  • 2Nose K, Hiramatsu A, Konishi M. Using Genetic algorithm for job-shop scheduling problems with reentrant product flows. In:ETFA Proceedings of the 7th IEEE International Conference on Emerging Technologies and Factory Automation,1999:40~45
  • 3Connors D, Feigin G, Yao D. Scheduling semiconductor lines using a fluid network model. IEEE Transactions on Robotics and Automation, 1994, 10(2):88~98
  • 4Liao D Y, Chang S C, Yen S R, et al. Daily scheduling for R&D semiconductor fabrication. IEEE Transactions on Semiconductor Manufacturing. 1996, 9(4):550~561
  • 5Jung ugk Y D. Duedate based scheduling and control policies in a multi-product semiconductor wafer fabrication facility. IEEE Transactions on Semiconductor Manufacturing, 1998, 11(1):155~164
  • 6http: //www.di.unipi.it/di. RelaxIV Manual. 2003