拱梁协作体系桥设计 被引量:5

Design of an Arch and Girder Coordination System Bridge
在线阅读 下载PDF
导出
摘要 邓家窑桥主跨长158 m,采用中承式拱桥与三角框架支撑的简支梁桥协作体系,以提高结构的跨越能力。经过设计方案比选,拱肋采用钢-混组合结构,即两侧拱脚段采用混凝土箱形断面,跨中段为钢箱断面;该桥拱脚水平推力由系杆及群桩基础共同承担,经过优化设计采用横桥向3排桩顺桥向4排桩基础+15 000 kN系杆力的组合形式;桥面系采用格构式钢-混组合梁,以减小上部结构重量,并方便施工。该桥经过10个月的施工工期,成桥景观效果、工程经济性较好。 The main span of the Dengjiayao Bridge is 158 m long.The bridge was designed as a coordination system of half-through arch bridge and simply-supported girder bridge supported by triangular frames for the purpose of enhancing the spanning capacity of the structure.Through comparison of the different proposed design of the bridge,it was determined that the arch ribs would be used with the steel and concrete hybrid structure,namely the sections of the structure close to the arch springs at both sides were of concrete boxes while the sections of the structure at midspan were of steel boxes.The horizontal thrust at the springs was jointly carried by the tie members and group pile foundations,for which a combination system having 3 rows of piles in a foundation transverse to the bridge and 4 rows of the piles along the bridge plus 15 000 kN tie member force were chosen after optimal design.The floor system was the grid type steel and concrete composite girder that can reduce the weight of the superstructure and facilitate the construction.The construction of the bridge within 10-month time proved both the landscape effect and economic benefit of the completed bridge were good.
出处 《世界桥梁》 北大核心 2010年第4期4-7,共4页 World Bridges
关键词 拱梁协作体系 设计方案比选 ARCH 群桩基础 中承式拱桥 组合形式 组合结构 优化设计 箱形断面 系杆 水平推力 施工工期 排桩 框架支撑 跨越能力 景观效果 结构重量 简支梁桥 拱脚 组合梁 half-through arch bridge coordination system arch rib floor system steel and concrete composite structure bridge design
  • 相关文献

参考文献3

二级参考文献1

  • 1[1]中铁工程设计咨询集团有限公司.三跨连续刚构钢桁拱桥关键技术研究总报告[R].北京:中铁工程设计咨询集团有限公司,2007

共引文献22

同被引文献33

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部