期刊文献+

水电站引水渠道上的涡管排沙工程 被引量:2

On the Spiral Pipe Sediment Release Work in the Water Diversion Canal of a Hydro-Power Station
在线阅读 下载PDF
导出
摘要 当渠道中的水流切向冲入涡管时产生的螺旋流会把落入涡管中的推移质泥沙颗粒卷扬起来,形成悬移质,而水流输送悬移质的能力远大于输送推移质的能力。作者利用此原理进行了水电站引水渠道上的涡管排沙设计,实践证明,该方法简单可行,排沙率高,造价低廉,有推广价值。文章介绍了涡管排沙的原理、实验结果、设计要点以及实例。 The suspended load can be formed while canal flow is shearing and scouring into the spiral pipe and the bed load sediment is rolling up by the screw flow. The suspended load transfering capacity of flow is much greater than the bed load capacity. The principle is used by author for design the spiral pipe sediment release work in the water diversion canal of a hydro-power station. The practice has proved that the measure is simple and feasible, high rate of sediment release, low cost and worth to spread. The principle of spiral pipe sediment release, experiment results, design guide and case study have been introduced in this paper. )
作者 张开泉
出处 《农田水利与小水电》 1995年第10期40-42,44,共4页
关键词 水电站 引水渠道 涡管 排沙 hydro-power station water diversion canal spiral pipe sediment release
  • 相关文献

同被引文献86

引证文献2

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部