摘要
从理论上研究了冷却塔在倾倒过程中,转角θ与时间t之间的关系。对于支撑部分保存完整的冷却塔,计算结果与实测结果基本吻合,相对误差小于10%。实际倒塌长度与理论倒塌长度之比为0.98,实际倒塌中心线与理论倒塌中心线左右偏差3.18°,倒塌初始时刻冷却塔未下坐,当t>0.6s之后,冷却塔开始下坐,下坐高度与倾倒时间成正比。最后,还分析了冷却塔在倾倒过程中的前冲和后坐问题。
The falling processes of cooling towers in destruction work are introduced In thispaper.The relation between the turning angle of the cooling tower and the falling time is calculat-ed theoretically.The calculated results are in good accord with that of the practical,the relativeerror is less than 10%. For example, the relative error of the falling length is 2%,the practicalfalling center line devilates form the theoretical about 3.18°. The cooling tower did not sinkdownward. Until after 0. 6s of falling taken place. Lastly,the problems of push forward andsinking downward are discussed as well.
出处
《爆炸与冲击》
EI
CAS
CSCD
北大核心
1995年第3期282-288,共7页
Explosion and Shock Waves
关键词
爆破拆除
倾倒过程
冷却塔
blasting demolition
falling process
collapsing length
push forward