摘要 从理论上研究了冷却塔在倾倒过程中,转角θ与时间t之间的关系。对于支撑部分保存完整的冷却塔,计算结果与实测结果基本吻合,相对误差小于10%。实际倒塌长度与理论倒塌长度之比为0.98,实际倒塌中心线与理论倒塌中心线左右偏差3.18°,倒塌初始时刻冷却塔未下坐,当t>0.6s之后,冷却塔开始下坐,下坐高度与倾倒时间成正比。最后,还分析了冷却塔在倾倒过程中的前冲和后坐问题。 The falling processes of cooling towers in destruction work are introduced In thispaper.The relation between the turning angle of the cooling tower and the falling time is calculat-ed theoretically.The calculated results are in good accord with that of the practical,the relativeerror is less than 10%. For example, the relative error of the falling length is 2%,the practicalfalling center line devilates form the theoretical about 3.18°. The cooling tower did not sinkdownward. Until after 0. 6s of falling taken place. Lastly,the problems of push forward andsinking downward are discussed as well.
机构地区 大连理工大学
出处 《爆炸与冲击》 EI CAS CSCD 北大核心 1995年第3期282-288,共7页 Explosion and Shock Waves
关键词 爆破拆除 倾倒过程 冷却塔 blasting demolition falling process collapsing length push forward sinkingdownward
  • 相关文献

参考文献3

  • 1李庆扬,数值分析,1982年
  • 2丘玉圃,FORTRAN程序设计,1981年
  • 3团体著者,理论力学.下,1979年

同被引文献33

引证文献6

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部