900MW锅炉空气预热器频繁故障及改造 被引量:3

A 900 MW Boiler's Air Preheater-Faults Incurred and Reconstruction
在线阅读 下载PDF
导出
摘要 介绍了外高桥900MW锅炉空气预热器在调试阶段频繁故障,严重威胁机组安全运行的情况,分析了故障原因。由于设计不当,导致空气预热器转子和围带的过应力且无法改回传统的正确设计。经深入研究,专门设计了围带与转子的半柔性悬挂式连接结构,能够减少转子和围带的不均匀热膨胀产生的围带过应力,彻底解决了这一问题。 Faults frequently incurred by Waigaoqiao 900 MW Boiler's air preheater, which seriously impaired the set's safety of operation, is being described and the causes of their occurrence analyzed. The preheater's rotor and shroud was found to be overstressed but it was impossible to restore them to the conventional construction. After some pondering, a semi-flexible suspended structure was designed for connecting the shroud with the rotor, which can prevent local overstressing of the shroud, caused by unever heat expansion of rotor and shroud, and herewith finally solving the problem.
作者 冯伟忠
出处 《发电设备》 2005年第3期149-153,166,共6页 Power Equipment
关键词 锅炉 空气预热器 围带 过应力 boiler air preheater shroud overstressing
  • 相关文献

同被引文献14

  • 1冯伟忠.900MW锅炉水冷壁鳍片超宽问题分析及处理[J].热能动力工程,2004,19(4):421-423. 被引量:10
  • 2冯伟忠.900MW超临界机组FCB试验[J].中国电力,2005,38(2):74-77. 被引量:56
  • 3冯伟忠.外高桥二期2×900MW工程调试工作特点及回顾[J].上海电力,2005,18(2):111-117. 被引量:7
  • 4冯伟忠.1000MW级火电机组旁路系统作用及配置[J].中国电力,2005,38(8):53-56. 被引量:53
  • 5Dr.-Ing.B.Epple,Dipl.-Ing.H.Brüggemann,Dr.-Ing.A.Kater.Low Nox tangetial firing system for bitunlinous coal[C].3 rd International Symposium on Coal Combustion (ISCC),18th-21st September 1995,Beijin,PR China
  • 6Dr.Bernd.Epple,Prof Benim A C.CRFD study of supercritical 2×900 MW boilers for shanghai/p.r.China[C].VOL conference,combustion and Firing system,"20thGerman Flame day,4th-5th september 2001,Fssen,Germany.
  • 7Prof.Dr.Bernd Epple,Werner Kessel.Computational methods for furnace design analyses in power plant technology compared with operational experiences[C].The Seventh Asia-Pacific International Symposium on Combustion and Energy Utilization (7th APISCEU),December 15-17,2004,The Hong Kong Polytechnic University,Hong Kong.
  • 8Kessel W,Scheffknecht G.First 900 MW supercritical boilers in Chin a:A new generation of coal fired power stations[C].Power-Gen Europe 2000,20-22 June 2000,Helsinki,Finland.
  • 9Helmut rüdiger,Günter Scheffknecht.Advanced steam power plant technology:Reliable technology for high efficiencies[C].POWER-GEN Europe 2001,29-31 May 2001,Brussels,Belgium
  • 10Prof.Dr.Bernd Epple,Wernet Kessel.Computational methods for furnace design analyses in power plant technology compared with operational experiences[C].The Seventh Asia-Pacific International Symposium on Combustion and Energy Utilization (7th APISCEU),December 15-17,2004,The Hong Kong Polytechnic University,Hong Kong

引证文献3

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部