摘要
香溪河是一条多泥沙的山区河流 .香溪河古洞口Ⅱ级水电站为发电需要要求进水口前淤积的泥沙进行有效的清除 .通过水工模型比对试验在原取水防沙方案的基础上进行了优化改进 。
The Xiangxi River is a fypical mountain river with lots of sediments.For the parpose of generating electricity,the sediments at the front of the intake for Gudongkou Cascade Ⅱ hydropower station shall to be cleared effectively.Through hydraulic model experimnetal research,the original waterinlet and sediment control scheme is optimized and rectified so as to obtain a good water-inlet and sediment control scheme finally.
出处
《三峡大学学报(自然科学版)》
CAS
2004年第5期395-398,共4页
Journal of China Three Gorges University:Natural Sciences