摘要
根据电力消纳研究,小湾水电站既是满足云南电网负荷发展需要,调整云南电网电源结构的关键性电站,又是优化南方区域能源配置,实施西电东送的主力电源。技术经济比较的结果认为,小湾水电站宜采用直流送电广东,同时以500kV交流接入云南主网,以满足云南负荷需求。
According to the electricity consumption analysis, Xiaowan Hydropower Station will be not only a key power plant to meet the increasing power demands and to adjust the power sources structure in Yunnan Power Grid, but also the main power source to optimize energy source disposition in the south part of the country and to implement the program of delivering power from the west to the east. The technical and economic analysis indicated that the power generated from Xiaowan Hydropower Station is preferable to be transmitted to Guangdong Province by DC system and to connect with Yunnan key power grid by 500 kV AC system so as to meet the load demands in Yunnan province.
出处
《水力发电》
北大核心
2004年第10期19-20,共2页
Water Power
关键词
电力市场
电力消纳
输电方案
小湾水电站
power market
power consumption
power transmission scheme
Xiaowan Hydropower Station