摘要 为了更加有效地求解同顺序加工调度问题,分析了现有启发式求解方法,发现影响解的质量的主要因素是调整近似解的方法和初始解,其中调整近似解的方法对解的质量影响较大。对此,提出了一种新的启发式方法。新方法中的调整方法考虑了调整对最短总加工时间的影响,调整任意给定的近似解不会降低解的质量,经过迭代运算,可以逐步改善近似解;新方法采用了多起点策略,利用调整方法调整不同初始解,选取最好的近似解作为问题的解,从而减小了初始解对问题解的质量的影响。实验结果表明,这种方法是有效的。 Research was carried on current heuristic methods to get more valid solutions to Permutation Flow- shop Scheduling Problem (PFSP). It was found that initial solution and the adjustment on approximation may affect the solution. The adjustments on approximation were more effectively. So a new heuristic method was proposed. The adjustments on approximation took the manufacture time into account, so adjustment on any initial solution with it would not decrease the quality of the solution. Improvement was achieved by iteration. Multi-start strategy was adopted to decrease the effect of initial solution. Better solution was achieved based on the adjustment on different initial solution. Experiments showed that the method was valid.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2004年第9期1124-1128,共5页 Computer Integrated Manufacturing Systems
关键词 同顺序加工调度问题 调度 启发式方法 permutation flow shop scheduling heuristic algorithm
  • 相关文献

参考文献11

二级参考文献16

  • 1张长水,阎平凡.解Job-shop调度问题的神经网络方法[J].自动化学报,1995,21(6):706-712. 被引量:38
  • 2陈雄 吴启迪.基于遗传算法的连铸调度问题[J].同济大学学报,1999,27:72-76.
  • 3陈雄.轧制生产批量计划模型及其算法的研究[M].沈阳:东北大学自动控制系,1998..
  • 4沈英俊,1996年
  • 5陈荣秋,排序的理论与方法,1987年
  • 6Hoon Shik Woo,Computers Operations Research,1998年,25卷,3期,175页
  • 7沈英俊,硕士学位论文,1996年
  • 8陈荣秋,排序的理论与方法,1987年
  • 9陈雄,同济大学学报,1999年,27卷,增刊,72页
  • 10陈雄,学位论文,1998年

共引文献29

同被引文献35

  • 1王正元,谭跃进.三机床置换Flow-shop问题求解的一种新方法[J].系统工程学报,2004,19(6):577-582. 被引量:4
  • 2陈胜,赵林度.实时任务动态调度算法[J].数学的实践与认识,2006,36(2):66-72. 被引量:2
  • 3程艮均,李东升.地空导弹武器装备战场抢修性分析[J].地面防空武器,2006(3):53-56. 被引量:4
  • 4Petra Schuurman. Approximating schedules [ D ]. Netherlands: The Technical University Eindhoven, 2000.
  • 5David Montana, Marshall Brinn, Scan Moore, et al. Genetic Algorithms for Complex, Real-Time Scheduling[ EB/OL]. (1998) [2005-12-15 ]. http:///vishnu, bbn. corn/papers/sine 98. pdf.
  • 6Roger Cline. Maintenance scheduling for mechanical equipment [EB/OL]. Denver, Colorado: United states department of the interior bureau of reclamation, (1998-3) [2005-12-15]. http:// www. usbr. gov/power/data/fist/fist4 - 1a/4-1a, pdf.
  • 7Roger Cline. Maintenance scheduling for electrical equipment [EB/OL]. Denver, Colorado: United states department of the interior bureau of reclamation, (2001-4) [2005-12-15]. http:/// www. usbr. gov/power/data/fist/fist4 - 1b/fist4 - lb. pdf.
  • 8Daniel Frost, Rina Dechter. Maintenance scheduling problems as benchmarks for constraint algorithms[EB/OL]. (2003-8)[2005- 12-15 ]. http://www, ics. uci. edu/- csp/r70b-maintscheduling. pdf.
  • 9PETRA Schuurman.Approximating schedules[D].Netherlands:The Technical University Eindhoven,2000.
  • 10DAVID Montana,MARSHALL Brinn,SEAN Moore,et al.Genetic algorithms for complex,real-time scheduling[EB/OL].(1998)[2005-12-15].Http://vishnu.Bbn.com /papers/smc 98.pdf.

引证文献5

二级引证文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部