期刊文献+

BIM技术在三亚新海干部疗养基地设计中的应用(连载二) 被引量:9

Application of BIM in the Design of Sanya Xinhai Cadre Sanatorium(2)
在线阅读 下载PDF
导出
摘要 传统的2DCAD技术在对建筑进行描述的过程中,由于建筑的平面和立面以及详图都是分开设计,不仅仅耗费时间,而且常常出现错误,难以将建筑形态加以详细准确描述,同时,由于CAD本身的局限性,设计师很难对二维空间模型做出准确的建筑性能分析。BIM技术的出现使设计师从二维平面拓展到三维空间,并且通过信息模型能准确的进行建筑性能分析。本文以三亚新海干部疗养基地为例,阐述了BIM技术在该项目设计过程中的应用,同时重点研究BIM技术和其他建筑性能分析软件的协同对接过程,归纳了一系列对可持续建筑设计具有指导意义的设计流程。 The traditional 2D CAD technology in the process of the architecture description, because the building plane, elevation and detailing are designed separately, not only wastes time, but also makes the mistakes frequently. It is difficult to describe the architecture in detail accurately, while due to the limitations of CAD, the designer is hard to make accurate building performance analysis of the two-dimensional space model. The designers can expand from the two-dimensional plane to three-dimensional space in designing as the appearance of BIM technology, and analyze the building performance accurately in the information model. This article gives an example as Sanya Xinhai Cadre Sanatorium, it states that BIM technology was used in the project design, at the same time, focusing on the study of BIM technology collaborates docking process with other building performance analysis software, summed up a series of design process which has guiding significance for the sustainable architecture design.
出处 《土木建筑工程信息技术》 2013年第1期75-84,共10页 Journal of Information Technology in Civil Engineering and Architecture
关键词 BIM 性能分析 设计流程 BIM Performance Analysis Design Process
  • 相关文献

参考文献11

二级参考文献20

共引文献423

同被引文献60

引证文献9

二级引证文献156

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部