期刊文献+

利用启发式方法求解带有爬升约束的火电机组多时段经济调度 被引量:5

A new heuristic approach for unit commitment
在线阅读 下载PDF
导出
摘要 提出了1种求解火电机组多时段经济调度的新型启发式方法。利用动态规划法求出计算系统负荷下满足爬升约束的各个待开机组的最优起、停状态及相应的起、停费用,将效率最高的机组投入运行;对起、停状态已定的火电机组再进行满足系统约束的最优经济分配。仿真结果表明,该方法克服了优先顺序表法难以得到起、停费用和爬升约束对机组优先级影响的不足,简单实用,计算速度快。 A new heuristic method for solving multi-period economic dispatch for thermal power plants was proposed.The dynamic programming method was applied to obtain the optimal start and stop status of each unit which was to be started and the corresponding start and stop cost which satisfied the cramping constraint under system load condition,thus to put the unit with the highest efficiency into service.Then,for the thermal power units whose start and stop status was certain,the optimal economy distribution that satisfying the system constraint was conducted.The simulation results showed that,this new heuristic approach overcame the problems appeared in priority list method,like difficult to obtain the unit start and stop cost,insufficient influence of cramping constraint on unit priority.It is practicable and effective.
出处 《热力发电》 CAS 北大核心 2013年第5期15-18,共4页 Thermal Power Generation
关键词 火电机组 多时段经济调度 启发式方法 爬升约束 动态规划 thermal power unit,multi-period economy dispatch heuristic approach ramping constraint dynamic programming
  • 相关文献

参考文献4

二级参考文献3

共引文献17

同被引文献50

引证文献5

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部