燃煤电厂电除尘器优化运行调整及效果分析 被引量:8

Operation Optimization and Effect Analysis for Electrostatic Precipitators in Thermal Power Plant
在线阅读 下载PDF
导出
摘要 田集电厂2×600 MW机组配套的电除尘器为四电场设置,2010年2号锅炉大修后经相关单位对其除尘性能进行测试,测试结果表明:2号锅炉的电除尘器除尘效率达不到设计要求。通过对影响电除尘器除尘效率的原因进行分析,找出了提高电除尘器除尘效率的方法,并对2号锅炉电除尘器运行方式进行具体优化调整,取得了良好环保和节能效果。 There are four electric fields in the electrostatic precipitators(ESPs) for the two 600-MW units in Tianji Power Plant.A performance test for the ESP was carried out in 2010 after the overhaul of Boiler 2,which indicates that the dust removal efficiency does not meet the designed parameters.Through the analysis on the efficiency-related factors,the method for improving the efficiency is found out and adopted to optimize the operation of the ESP for Boiler 2,which has achieved satisfactory results in environmental protection and energy saving.
出处 《中国电力》 CSCD 北大核心 2012年第9期72-75,共4页 Electric Power
关键词 电除尘器 运行优化调整 除尘效率 节能环保 electrostatic precipitator operation optimization and adjustment collection efficiency energy saving and environmental protection
  • 相关文献

参考文献2

二级参考文献6

共引文献2

同被引文献68

引证文献8

二级引证文献125

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部